top of page

Kuveyt Türk Banking Base
Location
Date
Construction Area
Land
Conceptual Design
Scope of The Work
Project Features
Cayirova / Kocaeli
2011 - 2013
120.340 sqm
35.661 sqm
Tasarım Merkezi ™
Preliminary Design, Final Design and Construction Drawings in all disciplines, Technical Specifications, Bill of Quantity (BoQ) and Quantity Survey, Calculations and Surveys, Tender Management, Contract Management, Quality Management, Cost Calculations, Construction Management
It has advanced automation and smart building systems. The top side of the atrium in the centre is covered with ETFE material. The building produces its own electric by trigeneration system,and the waste heat extracted from the building is used in the cooling and heating systems.

![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() |
bottom of page